SBS at the Prolight+Sound NAMM in Moscow

    SBS at the Prolight+Sound NAMM in Moscow

    Prolight + Sound NAMM Russia - the only trade fair in Russia and the CIS countries for professional sound, lighting and stage technology, multimedia technologies and services from leading suppliers and manufacturers around entertainment, integrated systems and creation. The fair is an excellent platform for presenting new products, exchanging experiences and seeking new contacts.

    Visit us at our stand and get an insight into the new functions of the COSTACOwin control system and the experiences with it in our Russian projects.

     

    Date: 16 to 18 September 2021
    Place: Expocentre, Moscow
    Exhibition stand: Hall 1, Stand 1G14

     

    As part of the VI Theatre Forum, we will present the topic "Presentation of SBS stage technology equipment with the COSTACOwin® control system, implemented in theatres in Russia."

    Please feel free to make a personal appointment at our stand with Sebastian Weber (sebastian.weber@sbs-dresden.de, +49 162 2055 798).

    More information on the fair and tickets are available at www.prolight-sound-namm-russia.ru.messefrankfurt.com.

    sefrankfurt.com.

    Prolight+Sound 2020

    Prolight+Sound 2020

    Postponed: Prolight + Sound 2020

     

    Further information will follow shortly.

    Kraftwerk Mitte Dresden – Dresden's biggest theatre project

    Kraftwerk Mitte Dresden – Dresden's biggest theatre project

    The conversion and building work on the Kraftwerk Mitte project has created a new centre for culture and creativity in Dresden city centre. Alongside the college of music, an events location and plenty of space for young, creative companies and startups, it also offers two important Dresden playhouses a new home.
    Dresden State Operetta, previously on the city outskirts, and the Junge Generation theatre have a new venue whose foyer they share along with various functional units. At the same time, Kraftwerk Mitte enables them to put on shows at the same time, with separate staff and their own independent structures.
    The Kraftwerk Mitte venue is a successful combination of old fabric and a new development. The old power station’s machine room, with its rusty steel girders and old gantry crane, is now used as a foyer. The new extension accommodates four stages: the hall for Dresden State Operetta, which seats 700, and the large stage of the Junge Generation theatre, which seats 350, plus the small stage and the studio stage. Further rehearsal rooms are found in a tower. SBS supplied and installed all the stage equipment and the COSTACOwin® computer control system for all four stages. In December 2016, Kraftwerk Mitte was officially opened and immediately went into regular operation.

    In May 2017, the Eastern group of the German Theatre Technical Society (DTHG) met at Kraftwerk Mitte. In addition to some interesting lectures, there were tours of Kraftwerk Mitte and the Kulturpalast. There was great interest among the almost 100 DTHG members; it is unusual for regional group meetings to attract such large numbers.

    Photo: Kai-Uwe Schulte-Bundert

    台湾 - SBS以其高质量、专业度及准时性 给客户留下深刻印象

    台湾 - SBS以其高质量、专业度及准时性 给客户留下深刻印象

    Taiwan's most important theatre was opened in 1987. Spread over four tiers, it has seating for 1,524 audience members. The theatre enjoys high international prestige, in part due to its commitment to preserving the art of classical Chinese theatre.
    In 2015, the decision was made to revamp it thoroughly, an international call for bids was made for the installation of new stage technology, including control technology, and SBS won. For SBS Bühnentechnik GmbH, the challenge to this task lay not only in its demanding list of services but also, above all, in the short time period available to carry them out and the company's lack of local knowledge.

    There were eight months from work starting on the construction site to it being presented to the user. The National Theatre Taipei project had a tight time frame from the very first day.
    Within just six weeks, the existing stage machinery and associated steel structure was removed, and each bolt was removed from every part of the building, right up to the roof trusses. Immediately afterwards, the installation of the new machinery began. 96 new drives were installed in the overstage machinery and 42 in the understage equipment.

    One particular challenge was organising the drives in the understage chamber. The old system’s stage lifts did not allow the lowest platform to be driven to the level of the storage space beneath the stage.
    To add a key function to the stage lift system, all the drive technology for the platforms was moved from the middle to the edge of the pit, ensuring that every cubic centimetre of available space was being used. The space in the pit where the drives used to be can now be used for stage lifts to sink down further, while the uninterrupted lower platform can now be used for staging performances.

    All 138 drives are controlled by SBS’s own COSTACOwin® computer control system. This tried-and-tested control system is already working away successfully in almost 100 theatres in more than 20 countries. In line with DIN EN 61508, it is certified according to the “SIL 3” safety integration level and thus complies with the highest safety standards in the industry.

    Immediately after SBS had completed the project, on 3 March 2017, the Taipei National Theatre began its regular programme. This was Taiwan’s first major theatre project in recent years to have been completed within budget and on schedule.
    Our special thanks go to the customer and their representatives, with whom we formed a good, goal-oriented team. The Taiwanese project partners commissioned to carry out work on site also played an important role in this successful team performance.
    The opening was a shared success!

    © 2021 SBS Dresden All Rights Reserved.