Project duration
2012 - 2013
Location
Saarbrücken, Germany
Genre
Theatre
Services
The stage machinery – in part dating back to the 1930s – of the Saarland State Theatre in Saarbrücken was replaced in the period from April to November 2013.
The old machinery, including the hydraulic drive system, was dismantled and replaced by a complete overstage machinery (with over 80 drive axles) as well as an understage machinery encompassing four stage podiums, five sidestage trolley systems and a revolving carriage. Our COSTACOwin® control system was installed to provide a user-friendly and secure operation of the stage machinery. A total of approx. 200 tons of steel was dismantled and 500 tons newly installed.
In addition to the short realisation period, the greatest challenge was the complicated site logistics, the limited storage space and the building work taking place above and below the stage simultaneously. The reopening of the theatre was celebrated on 24th November 2013 with the premiere of Tosca.
Download
Download our detailed reference brochure with all technical data as a pdf file.